ഡിസംബർ 18, 2020 SE, JnNURM, Kochi KWA Previous Post KIIFB – Augmentation of WSS to Kollam Corporation – PHASE – II – Package 1 – Laying Raw water pumping main with 1219 m.m, 12.50 m.m thick MS pipe for a length of 16035 mts.and 10 mm thick MS pipe for a length of 12095 mts. from Intake well at Njankadvu to WTP at Vasoorichira. Next Post KIIFB- WSS to Kodassery, Pariyaram and Athirappilly Panchayaths in Thrissur district – Package – I – Design, Construction, Testing, Commissioning and Maintenance of 12 MLD SCADA operated WTP, 9m Dia Intake well cum Pump house, Supplying, laying, testing and commissioning 450mm DI K(9) RWPM – 4900m, 450mm DI K(9) CWGM – 10230m, Supply, erection, testing and commissioning of 2nos VT RW and 2nos Centrifugal CW pump sets, 500 KVA & 100 KVA 11KV/433V outdoor type transformer- 1no, Construction of 2LL OHSR, 2LL Clear water sump &pump house, road restoration works and allied works