January 29, 2021 Project Division, Alappuzha Previous Post NABARD RIDF XXIV-WSS to Erumely:-Laying distribution system in Zone I(part)& Zone VI :-Supplying ,jointing, testing and commissioning of :(1)Distribution system from OH tank at WTP site Zone I(2) Distribution system from GLSR at Pallikunnu-Zone VI using various sizes of DI K9 pipes (150mm to 350mm dia.),PVC pipes (90mm to 160mm dia) & GI pipes (80mm to 150mm dia.) Next Post Green Book-Arayd-Augmentation of RWSS to Aryad-Construction of 3.50 LL OHSR at Komalapuram, Laying of Distribution network 17.40 km having dia 90mm, 110mm, 160mm, 200mm HDPE and 200 mm DI pipes